Scheduling Board for Staff Planning

After reading this article you'll be able to plan a whole week across all events on the Scheduling Board, reassign shifts by drag and drop, and keep an eye on live staffing cost.

The Scheduling Board shows staff × weekdays at a glance — across every event running that week. Instead of planning shift by shift inside a single event, you immediately see who's working where, and you can reassign anyone with a drag.

Scheduling Board for Staff Planning

The video shows how you create and staff shifts on an event and plan the whole week on the dispatch board.

You’ll find the individual steps written out below as well.

Where to find the board

  1. Open Staff in the left navigation.
  2. Switch to the Shift Plan tab.

Unlike the shift plan inside an event (which only shows that event's shifts and is where you create and price jobs), the Scheduling Board shows every staff member across all events of the visible week at once.

Reading the board

  • Rows are your staff members, columns are the seven weekdays.
  • The arrow icons next to the period label (e.g. “Wk 34 | Aug 18 – Aug 24”) step one week back or forward. In the month view the same arrows move a whole month.
  • Every shift tile carries a colored dot linking it to its event. The Events this week legend above the board maps the colors.
  • When more than one event runs that week, the filter chips (All + event names) narrow the board down to a single event.
  • The board only shows events that are still going ahead. Cancelled events and declined requests appear neither as a filter chip nor in the legend nor as a shift tile — open requests do, because they are still real work. So that an open request is not mistaken for a confirmed date, it carries an Inquiry badge — as long as the event is not yet confirmed in the workflow — in the legend, in the filter chip and on every shift tile. Once confirmed, the badge disappears.
What you see in a cellMeaning
Green tintstaff member marked this day as preferred availability
Red hatchingstaff member is unavailable that day
"Vacation" badgeapproved leave or time off in lieu — no shift possible that day
Colored dot on the tileshows which event the shift belongs to

Filter team: show only part of the team

In large teams the week quickly gets crowded. Use Filter team at the top right of the shift plan to hide people you are not planning right now:

  • Position / area — for example only the kitchen or only service. This uses the Position field in the staff file.
  • Employment type — for example hide mini-jobbers.
  • Status — for example hide people on maternity leave or on long-term sick leave.
  • Individual people — every person can also be hidden on their own.

Just untick whatever you don’t want to see. The button then shows how many people are hidden, and Show everyone again resets the filter. Your browser remembers the selection for this workspace, so the shift plan looks the same next time. Colleagues keep their own selection.

The filter only hides rows in the week view; shifts are never deleted or reassigned. Newly added staff and new areas show up automatically.

Hours next to the name: contract, planned, overtime

In the week view, each name shows how much the person should work and how much you have already planned:

  • Week 32 h / 40 h — hours planned in the visible week against the weekly contract hours (field h / week in the staff file). If the plan exceeds the contract hours, the value is highlighted.
  • Month 120 h — hours planned in the calendar month of the visible week.
  • OT +5.5 h — today’s overtime balance: the carry-over from previous months plus the current month up to today. It is the same figure as Total in the time balance under Time Tracking.

Shifts count as planned when the person is assigned or has confirmed — not when they declined, called in sick or only applied, and not cancelled shifts. The full shift length is counted; the shift plan does not plan breaks. Hover over the figures to see the explanation.

Only people who may see the workspace’s working times see these hours — the same setting as for the Time Tracking tab (see Working time & breaks).

Month view: the whole month, and the shifts nobody has taken

The toggle in the top-right of the board switches between Week and Month. It always opens on Week, so nothing about your usual view changes until you switch.

The month view answers two questions the weekly grid cannot: “How full is this month?” and “Which shifts has nobody taken yet?” In the weekly grid every row is a person — a shift with nobody assigned has no row there and stays invisible.

  • The month shows six week rows, Monday first. Days from the previous and next month sit faded at the edges, but their shifts still count.
  • Each shift is a tile inside its day, in chronological order: start time, name, and the staffing count 2/3 — two of three people needed.
  • The colored dot links the shift to its event just like in the week; for a shift without an event it is the job's color.
  • When a day holds more than three shifts, +2 more appears underneath.
  • Cancelled events and declined requests stay out here too — the same rule as in the week. Open requests stay visible and carry their Inquiry badge, as in the week, as long as they are not yet confirmed.

Finding open shifts

Tiles are colored by staffing. The Staffing legend above the grid names the three levels:

LevelMeaning
Fully staffedevery required slot is filled
Understaffedat least one person is missing, e.g. 2/3
Unstaffednobody assigned yet, 0/3

The Open shifts only toggle above the grid hides every fully staffed shift. What remains is exactly the work still waiting to be assigned. The toggle stays on while you page through months.

From the month back into the week

Clicking a day — or +2 more — switches to Week, landing on exactly that day's week. The month is the overview; the week stays the surface for reassigning and creating.

On a phone an agenda list replaces the grid: every day of the month that has shifts, listed in chronological order.

Reassigning a shift by drag and drop

  1. Grab a shift tile and drag it onto the cell of the staff member you want — on the same day. Dragging to another weekday isn't possible; the board shows "Shifts can't be dragged to another day" instead.
  2. Drop the tile on a valid cell and the shift is reassigned immediately.
  3. If the target person has a vacation or overlap conflict that day, a Confirm reassignment dialog opens first with the conflict details. Click Reassign to proceed anyway, or Cancel to keep the original assignment.
  4. You don't have to drag: click the small swap icon in the top-right corner of the tile (always visible on touch devices) and pick the target person from the Reassign to … list.

Edit or delete a shift

A short click on a shift in the week opens the Edit Shift dialog — including for shifts without an event.

  • Edit: change the name, start and end, the number of people needed and the price lines right in the dialog; Save applies them.
  • Assign and duplicate: in the Assignments section you assign people or remove them. Duplicate creates a copy of the shift.
  • Delete: Delete shift? opens the confirmation with the note All assignments will also be removed. Only Delete removes the shift for good; Cancel keeps it.

Clicking and dragging don’t get in each other’s way: dragging starts once you move the tile a few pixels (on touchscreens: press briefly). A short click opens the dialog instead; after a completed drag it does not open.

Creating a shift directly on the board

  1. Hover an empty cell — a plus icon appears in the top-right corner.
  2. Click it to open the Add shift dialog. If there are already open, unfilled shifts that day, you can assign the person straight to one of them (Open shifts on this day section, Assign button).
  3. Otherwise, fill in Name, Start Time, and End Time under New shift and click Create shift — the shift is created directly for this person and day, without an event assignment.
  4. For a full shift, click New Shift in the top-right of the board instead. The larger dialog offers all the fields from the event-level shift planning: required headcount, Allow self-signup, Approval required, assigned staff, address, notes and pricing.
  5. Only fill in Event (optional) if the shift belongs to an event. Leave it on No event (operating shift) and you get a shift for your regular operations, for example the daily opening shift. Only people who may create events can pick an event; for everyone else every new shift here is an operating shift.
  6. When you set the Start Time, the End Time is automatically set four hours later, so an evening shift starting at 8 pm ends at midnight on the next day. If you change the end time yourself, it stays as you set it.

Operating shifts your team signs up for

You plan opening hours rather than events, say every day from 4 pm to 10 pm? Create the shift via New Shift without an event, enter how many people you need under Required Staff and switch on Allow self-signup. The shift shows up among the open shifts in the employee portal until every slot is taken.

With Approval required, staff don't sign up directly but apply. You then decide under Staff → Applications who gets the shift, and the person receives a message with the result. If every week looks the same, copy the finished week to the following weeks with Copy week. Self-signup and approval are copied along.

Copy week: carry the plan over to the following weeks

If you plan the same shifts every week, for example a lunch service Monday to Friday with the same people, you don't have to create them again each week. Plan one week and copy it.

  1. In the Week view, go to the week you want to use as the template.
  2. Click Copy week in the top-right.
  3. Enter how many following weeks to copy to (1 to 12). The target calendar weeks and dates are shown below.
  4. Keep Copy assigned people ticked if the assigned people should come along. Without it, only the shifts are created and the slots stay open.
  5. Keep Skip public holidays ticked if no shift should be created on public holidays. The holidays you set up for the workspace in the settings apply.
  6. Check the preview and click Copy.

The preview recalculates with every change and creates nothing yet. It shows you:

  • how many shifts will be created,
  • which ones are skipped and why: Public holiday or Already exists (the shift is already in the target week, for example because you copied the same week before),
  • which people are not assigned and why: Vacation (approved vacation that day) or Overlaps own shift. The shift is still created, only the slot stays open,
  • as a note only, who has marked the day as unavailable. These people are still assigned.

What applies when copying:

  • Only shifts without an event are copied. Event shifts stay with their event, use Duplicate event for those. The dialog tells you how many there are that week.
  • Every copy lands on the same weekday at the same time of day, also across the clock change. A night shift from Friday 22:00 to Saturday 02:00 stays a night shift.
  • Job, required headcount, location, person in charge, hourly rate, staffing cost rows and the self sign-up settings come along.
  • Assigned people keep their status: whoever confirmed is confirmed on the copy too, whoever still has to confirm still has to. Sick notes, declines and applications are not copied.
  • At most 500 new shifts per run.
  • Every assigned person gets one phone notification, for example “5 new shifts from 21 Oct to 15 Nov.”, not one email per shift. People without notifications switched on see the shifts in the app and in their calendar subscription.

After copying, the board stays on the template week. Use the arrows to look at the new weeks.

Undoing a copy

Right after copying, the message at the bottom shows an Undo button. Later you find it in the Copy week dialog under Undo last copy; there Univents asks you once more, showing how many shifts in which calendar weeks will be deleted. This removes exactly the shifts of that run, including assignments and staffing cost rows. The people affected get one bundled notification, no cancellation email.

Undo only works as long as none of the copied shifts has been changed. If one of them has been reassigned, confirmed, declined or someone has logged time on it, you see “Some shifts were already edited, please delete them individually.”

Repeat shift: one shift on several days

A restaurant has fixed hours and fixed people: Tuesday to Saturday from 4 to 10 pm, always the same person. You do not have to copy a week for that. Create the shift once and repeat it.

  1. Open a shift without an event with one click in the schedule. Or create a new one: in the New shift dialog, the option Repeat afterwards appears when no event is chosen.
  2. In the Edit shift dialog, click Repeat ….
  3. Choose the weekdays (the weekday of the shift is preselected) and the date under Until and including. The limit is 26 weeks from the day of the shift.
  4. Keep the assigned person and Skip public holidays are ticked. Untick them if you want it differently.
  5. The preview tells you how many shifts will be created and what is skipped. Then click Repeat.

What applies:

  • You get individual, ordinary shifts. You can change or delete each one later. No rule runs in the background: when the period ends, simply repeat the shift again. Anything that already exists is skipped.
  • Only shifts without an event can be repeated. For events there is Copy event.
  • Every repetition sits at the same time of day, even across the clock change. A night shift stays a night shift.
  • With Keep the assigned person, the assigned people are on the new shifts too, with the same status (accepted stays accepted). Anyone on vacation that day or already on an overlapping shift is not assigned there. The preview lists these cases with the reason.
  • Each assigned person gets one notification on their phone, not an email per shift.
  • Right after creating them, the message at the bottom shows Undo. Later you find the button in the dialog under Undo most recent copy run. This only works as long as none of the new shifts has been edited.
  • If your team uses one shift per person (same job, same time, in parallel), Univents does not create a second shift but adds the person to the existing shift, as long as they are not on it yet and are free. That way you can repeat Anna’s, Ben’s and Carla’s shifts one after the other. The preview shows separately how many shifts are created, in how many existing shifts the person is added, and what is skipped (holiday, already assigned, not available).
  • Undo only takes back the newly created shifts. Added people stay; you remove them from the shift one by one. Before deleting, the dialog shows you the time, the period and who started the run, because it is always the most recent copy run of the workspace, even if a colleague created it.
  • Your role needs Create and Edit in the Staff module, as with Copy week.
  • The AI assistant can do this too: “Repeat the evening shift Tuesday to Saturday until the end of January.” It first tells you the numbers and only creates the shifts after you confirm.

Insert a job template: fixed shifts in one click

If you have saved your recurring shifts as a job template, for example “Restaurant evening” with kitchen and service, you can insert it straight into the shift plan – without an event.

  1. Click Insert template in the top right. The button is available in both the week and the month view.
  2. Choose the Template.
  3. Choose the Day. It defaults to today if today is in the period shown, otherwise to the first day of that period.
  4. If shifts in the template are set relative to the event start (for example two hours before the start), enter the Reference time. It suggests the start time of the event the template was saved from. An offset past midnight lands on the next day. Shifts with a fixed time keep their time; if the template only has those, the dialog does not ask for a reference time.
  5. Check the day and time of each shift in the preview and click Create shifts.

Univents creates the job and all shifts of the template as operating shifts: with the number of people needed, self sign-up and approval, location, note and price lines. The template does not assign anyone, so the new shifts start out open. You see them straight away in the month view; in the week they appear in a person's row as soon as you assign them (click a day, section Open shifts on this day). With self sign-up, staff add themselves in the staff portal.

You create job templates under Settings > Templates, or you save a finished job in an event with Save as template. If you plan every week the same way, insert the template once and then carry the week over with Copy week.

Editing a shift straight from the list

Next to Shift Plan sits the All Shifts tab. It lists every shift in the workspace with its event, start, end, staffing level and status — including the ones not tied to any event (filter Without Event). The same editing dialog opens when you click a shift in the week; the list remains the way to reach every shift, including those outside the visible week.

  1. Click a row. The same editing panel opens that you know from the event.
  2. There you change the name, start and end, the required headcount, address, person in charge, notes and the pricing rows.
  3. In the same dialog you assign people, duplicate the shift or delete it.
  4. After saving, the new state is in the list right away, staffing level included.

Anyone without permission to edit events can still read the list but cannot change anything.

Live staffing cost

Below the board, the Planned staffing cost bar totals every planned shift in the visible week.

  • Each event gets its own row with hours and cost; shifts without an event are grouped under No event.
  • The week's Total is shown in the top-right of the bar.
  • The bar refreshes automatically after every reassignment or new shift — a row whose amount changed briefly flashes green.

This cost figure is calculated from the hourly rates (payroll products) linked to your staff — see Creating & configuring staff for details.

Frequently asked questions

How is the Scheduling Board different from the shift plan inside an event? The shift plan inside an event only shows that event's shifts and is where you create and price jobs. The Scheduling Board under Staff > Shift Plan instead shows every staff member across all events of a week — useful for spotting overlaps and reassigning quickly. See Creating and Pricing Shifts & Jobs for job and shift creation.

Why does a shift show in the month view but not in the week? Because nobody is assigned to it yet. The weekly grid has one row per staff member, so a shift without a person has nowhere to go. The month view lists shifts per day and therefore shows it — as 0/3 in the warning color. Click the day to assign someone in the week.

Why can't I drag a shift? Reassigning by drag and drop requires the Events → Edit or Staff → Edit permission from the role matrix. Without it, the board still shows the week's schedule, but dragging and the swap button are disabled.

Why don't I see the “Copy week” button? It only shows in the Week view, not in the month. Your role also needs Create and Edit in the Staff module (or both in the Events module). Edit is needed because the staffing cost rows of the shifts are copied too. Undoing additionally requires Delete.

I don't see the cost bar or availability colors — what's missing? Both layers require the Staff → Create permission. Without it, the grid with the shifts stays fully usable, only the cost bar and the availability tint stay hidden.

Why is a cell tinted green or red when there's no vacation entered? Green and red come from each staff member's availability settings (preferred / unavailable), not from the vacation calendar. Vacation is shown separately as a green Vacation badge. See Time Tracking & Leave Management for managing availability and leave.

Why don't I see the “Insert template” button, or why is the list empty? The button needs the same rights as New Shift: Staff → Create or Events → Create. If the template contains price lines, Edit is needed as well, because the staffing-cost lines are created too. Job templates belong to the events area: without Events → View, the list stays empty.

Univents newsletter

Three topics, pick any. Roughly once a month, no more.

Topics